Siti Mariam, Man (2024) Development of Wire-Bonding Dispatch System Using Lean Six Sigma for Semiconductor Back-End Assembly. Doctoral thesis, Universiti Utara Malaysia.
depositpermission-s900375.pdf
Restricted to Repository staff only
Download (754kB) | Request a copy
s900375_01.pdf
Restricted to Repository staff only
Download (2MB) | Request a copy
s900375_02.pdf
Restricted to Repository staff only
Download (1MB) | Request a copy
Abstract
In the rapid growth of the semiconductor industry, subcontractors are highly competitive to gain their market segment and sustain the business. The ability to meet the shipment commits is critical, often gated by the process cycle time. Increasing challenges arise with high product customization in a make-to-order (MTO) environment. Such a company is Carsem (M) Sdn. Bhd. which had faced the issues of long cycle time resulting in shipment de-commits, and profit loss. The manual planning procedure could not cater to the demands of a quick turnaround for complex products
| Item Type: | Thesis (Doctoral) |
|---|---|
| Supervisor : | Zain, Zakiyah and Mohd Nawawi, Mohd Kamal |
| Item ID: | 10989 |
| Uncontrolled Keywords: | Lean Six Sigma, DMAIC, Cycle time, Systematic wire-bonding planning procedure, Wire-bonding dispatch system |
| Subjects: | H Social Sciences > HE Transportation and Communications |
| Divisions: | Awang Had Salleh Graduate School of Arts & Sciences |
| Date Deposited: | 20 Feb 2024 01:33 |
| Last Modified: | 20 Feb 2024 01:33 |
| Department: | Awang Had Salleh Graduate School of Arts & Sciences |
| Name: | Zain, Zakiyah and Mohd Nawawi, Mohd Kamal |
| URI: | https://etd.uum.edu.my/id/eprint/10989 |

